The river cruise vessel New Era 2020 is designed to be 29.7 meters long and 9 meters wide to accommodate 82 passengers on Jinji Lake. With proper energy control by the S-Renewable system, the vessel is supplied by four battery packs, totally rated up to 1100 kWh, to drive two propellers, 80 kW each. The vessel is supposed to be delivered to the customer in 2020.
The S-Renewable system onboard is highly integrated and interfaced to 1100 kWh battery packs to achieve green operation, with benefits of zero emission and ultra-low vibration.