The passenger line with length of 39.8 m and breadth of 10 m can contain 150 passengers. Equipped with the S-Renewable system, the vessel is powered by batteries up to 1198 kWh to drive two 75 kW propulsion motors, scheduled to be delivered in 2021.
Thanks to the S-Renewable system regulating batteries with the common DC grid topology, the passenger liner can achieve pure green operation with zero emission.